Call Now
Insured
Back to Blog

The Ultimate Guide to Sealcoating and Striping in North Jersey (2025)

Complete guide to sealcoating and striping services in Union and Essex County. Learn why combining these services saves 15%, ideal timing, costs, and what to expect from start to finish.

November 10, 2025
12 min read
Union & Essex County, NJ

Why Smart Property Owners Combine Sealcoating and Striping

If you're considering sealcoating your parking lot or driveway, and your line striping is faded, here's a fact that will save you money: **combining these services into one project saves 10-15% compared to doing them separately**.

Over 31 years serving North Jersey, I've watched property owners learn this lesson the expensive way. They sealcoat in spring, then realize their faded lines are barely visible on the fresh black surface. Six months later, they're calling us back for striping—paying full mobilization fees twice.

Here's the smarter approach.

What Is Sealcoating and Striping?

Sealcoating: The Protective Shield

Sealcoating is a liquid protective coating applied to asphalt surfaces to: - **Prevent oxidation** from UV rays that turn asphalt gray and brittle - **Block water penetration** that leads to cracks and potholes - **Resist oil and gas spills** that deteriorate asphalt binder - **Restore rich black color** for dramatic curb appeal - **Extend pavement life by 200-300%** (from 10 years to 20-30 years)

**Cost**: $0.15-$0.30 per square foot for commercial lots, $300-$800 for residential driveways

**Frequency**: Every 2-3 years for residential, every 1-2 years for commercial

Striping: The Safety and Organization System

Line striping (parking lot striping or pavement marking) involves painting lines, symbols, and markings for: - **Parking space delineation** (standard 9' x 18' stalls) - **ADA-compliant handicap spaces** (minimum 8' wide + 5' access aisle) - **Traffic control** (arrows, stop bars, crosswalks) - **Fire lanes and no parking zones** - **Loading zones and reserved spaces**

**Cost**: $1-$5 per linear foot depending on complexity

**Frequency**: Refresh every 18-24 months as paint fades

Why Combining Services Saves Money

1. Single Mobilization Fee

**Separate Services:** - Sealcoating company mobilization: $200-$400 - Striping company mobilization: $200-$400 - Total: $400-$800

**Combined Service:** - One mobilization fee: $200-$400 - **Savings: $200-$400**

2. Coordinated Scheduling = Less Downtime

**Separate Services:** - Sealcoat week 1: Lose parking for 2-3 days - Stripe week 12+: Lose parking for 1 day again - Total disruption: 2 separate events

**Combined Service:** - Sealcoat day 1 → Cure 24-48 hours → Stripe day 2-3 - Total disruption: ONE 3-4 day project - **Benefit: Half the business disruption**

3. Better Results on Fresh Sealcoat

Paint adheres 25% better to freshly sealed asphalt compared to aged pavement. Your striping will: - Last 6-8 months longer before fading - Look crisper and more professional - Resist weathering better

4. Package Pricing Discounts

Most reputable contractors (like Randy Seal Coating & Striping) offer **10-15% discounts** on combined packages because: - Lower overall labor costs - Efficient project management - Preferred customer incentive

**Example Savings:** - Sealcoating only: $2,000 - Striping only: $1,500 - Total separate: $3,500 - **Combined package: $3,000** - **You save: $500 (14%)**

The Complete Sealcoating and Striping Process

Phase 1: Free Inspection & Quote (Day 0)

What we do: - Measure square footage (for sealcoating pricing) - Count linear feet of existing striping - Assess pavement condition (cracks, potholes) - Evaluate drainage - Discuss ADA compliance needs - Provide detailed written estimate

**Timeline**: 30-60 minutes on-site, quote within 24 hours

Phase 2: Surface Preparation (Day 1 Morning)

Critical steps: 1. **Power sweep** entire surface to remove debris, dirt, leaves 2. **Clean oil stains** with commercial degreaser 3. **Fill cracks** with rubberized crack filler (if needed) 4. **Repair potholes** with hot asphalt patch (if needed) 5. **Edge trimming** around curbs and expansion joints

**Timeline**: 2-4 hours depending on lot size

Phase 3: Sealcoating Application (Day 1 Afternoon)

Professional application: 1. **Tape off edges** - Protect concrete, buildings, landscaping 2. **Apply first coat** - Spray or squeegee method for even coverage 3. **Allow dry time** - 2-4 hours depending on temperature 4. **Apply second coat** - Perpendicular to first for full coverage 5. **Install barriers** - Cones and "Do Not Enter" signs

**Materials Used:** - Coal tar emulsion (most durable) OR - Asphalt emulsion (eco-friendly alternative) - Sand additive for texture and traction - Polymer additives for flexibility and adhesion

**Timeline**: 4-6 hours application + overnight dry

Phase 4: Curing Period (Days 2-3)

Critical waiting period: - **24-48 hours minimum** before striping - Temperature dependent (warmer = faster cure) - No vehicle traffic during this period - Light foot traffic OK after 12-24 hours

**Why this matters**: Striping on uncured sealer will: - Damage the fresh seal - Result in poor paint adhesion - Create permanent marks in the soft surface

Phase 5: Layout & Measurement (Day 3 Morning)

Before painting: 1. **Measure and chalk layout** for all lines 2. **Verify ADA compliance** (space widths, access aisles) 3. **Confirm parking count** meets municipality codes 4. **Mark arrow locations** and directional flow 5. **Get final approval** on layout from property owner

**Timeline**: 1-2 hours for typical 50-space lot

Phase 6: Line Striping (Day 3 Afternoon)

Professional painting: 1. **Apply parking stall lines** (4" wide standard) 2. **Paint handicap symbols and signage** (blue and white) 3. **Add directional arrows** (3-4 feet long) 4. **Mark fire lanes** (red or yellow per local code) 5. **Paint stop bars** at intersections 6. **Add any custom logos or text**

**Paint Options:** - **Water-based latex** - Standard, 12-18 month lifespan - **Chlorinated rubber** - Premium, 18-24 month lifespan - **Thermoplastic** - Commercial grade, 3-5 year lifespan (extra cost)

**Colors**: White (standard), yellow (fire lanes, no parking), blue (ADA)

**Timeline**: 2-4 hours application + 2-4 hours dry before traffic

Phase 7: Final Inspection & Walkthrough (Day 3 or 4)

Quality assurance: - Verify all lines are straight and uniform width - Confirm ADA spaces meet regulations - Check for missed spots or overspray - Ensure proper paint adhesion - Review maintenance recommendations - Provide warranty documentation

**Warranty**: 2 years on sealcoating, 1 year on striping (standard industry)

Ideal Timing for Sealcoating and Striping in NJ

Weather Requirements

**Sealcoating needs:** - Air temperature: 50°F+ at application AND for 48 hours after - Pavement temperature: 50°F+ - No rain for 24-48 hours after application - Low humidity (below 90%) for faster curing

**Striping needs:** - Air temperature: 40°F+ at application - Dry pavement (no morning dew) - No rain for 4-6 hours after application

Best Months in North Jersey

**Prime Season (April - October):** - **April-May**: Excellent - mild temperatures, low humidity - **June-August**: Good - watch for extreme heat (100°F+ can dry sealer too fast) - **September-October**: Excellent - ideal temps, stable weather patterns

**Marginal Season (March, November):** - Possible but weather-dependent - Forecast monitoring critical - May need rain delays

**Off-Season (December - February):** - Not recommended - temperatures too cold - Sealer won't cure properly - Paint won't adhere well

Scheduling Strategy

**For North Jersey property owners:**

  1. **Schedule early** - Our prime months (May, September, October) book 4-6 weeks in advance
  2. **Plan around events** - Don't schedule sealcoating right before your busy season
  3. **Allow flexibility** - Weather delays happen; build in 1-week buffer
  4. **Coordinate with tenants** - Give advance notice of parking restrictions

Cost Breakdown: What You'll Actually Pay

Residential Driveway (Average 600 sq ft)

**Sealcoating:** - Material cost: $150-$200 - Labor: $150-$300 - Crack filling (if needed): $75-$150 - **Subtotal: $375-$650**

**Striping (Optional for residential):** - Basketball court lines: $150-$300 - Parking space delineation: $75-$150 - **Subtotal: $75-$300**

**Combined Package: $400-$800** (saves $50-$150)

Small Commercial Lot (5,000 sq ft, 20 spaces)

**Sealcoating:** - Material: $500-$750 (at $0.10-$0.15/sq ft material cost) - Labor: $750-$1,000 - Crack filling: $200-$400 - **Subtotal: $1,450-$2,150**

**Striping:** - 20 spaces x 50 linear feet each = 1,000 LF - At $2/LF = $2,000 - Arrows & symbols: $200-$400 - **Subtotal: $2,200-$2,400**

**Separate total: $3,650-$4,550** **Combined package: $3,200-$3,900** (saves $450-$650)

Large Commercial Lot (20,000 sq ft, 80 spaces)

**Sealcoating:** - Material: $2,000-$3,000 - Labor: $2,500-$3,500 - Crack filling/repair: $800-$1,200 - **Subtotal: $5,300-$7,700**

**Striping:** - 80 spaces x 50 LF = 4,000 LF - At $1.50/LF (volume discount) = $6,000 - ADA spaces (4 required): $400 - Arrows, symbols, fire lanes: $600-$800 - **Subtotal: $7,000-$7,200**

**Separate total: $12,300-$14,900** **Combined package: $10,500-$12,700** (saves $1,800-$2,200)

Common Mistakes to Avoid

1. Sealcoating First, Striping "Later"

**The Problem**: "Later" becomes 6-12 months later. Meanwhile: - Faded lines are barely visible on fresh black sealcoat - Customers/tenants complain about confusing parking - ADA compliance issues arise - You pay full mobilization fees twice

**The Solution**: Always plan striping when you schedule sealcoating

2. Choosing the Lowest Bidder

**The Problem**: Cheap sealcoating fails within 12 months because: - Watered-down sealer (50% water vs. 25% water) - Single coat instead of two - No crack filling or prep work - Unlicensed applicators with poor technique

**The Solution**: Compare apples-to-apples: - Ask about material brand and mix ratio - Verify two-coat application - Confirm surface prep is included - Check license and insurance

3. Skipping ADA Compliance Review

**The Problem**: Non-compliant striping can result in: - $75,000 fines for first violation - Lawsuits from injured parties - Required immediate correction at your expense

**The Solution**: Ensure contractor verifies: - Minimum 8-foot-wide handicap spaces - 5-foot access aisles (can be shared) - Proper signage (vertical sign + pavement marking) - Required number of spaces per total count

4. Not Asking About Cure Time

**The Problem**: Some property owners allow traffic too early: - Tire marks permanently embedded in fresh sealer - Sealer doesn't fully cure and fails within 6 months - Paint smears or doesn't adhere properly

**The Solution**: Ask specifically: - When can foot traffic resume? (12-24 hours) - When can vehicles return? (24-48 hours) - When will striping happen? (After full cure)

Maintenance After Sealcoating and Striping

Year 1-2: Minimal Maintenance

**Sealcoating:** - Sweep regularly to prevent debris buildup - Clean oil spills immediately with degreaser - Avoid using salt or harsh chemicals (use sand for traction) - Inspect for any early crack development

**Striping:** - Pressure wash annually to keep lines bright - Touch up high-traffic areas if fading (crosswalks, stop bars) - Monitor ADA symbol visibility

Year 2-3: Re-Striping Likely Needed

**Why striping fades first:** - Traffic wear (tire marks) - UV exposure - Snow removal scraping - Chemical exposure (salt, oil)

**When to re-stripe:** - Lines are 50% faded in high-traffic areas - ADA symbols are no longer clearly visible - Stop bars are barely recognizable - Directional arrows are unclear

**Cost**: Less than initial striping since sealcoat is still in good condition

**Timeline**: Half-day project, minimal disruption

Year 3-4: Re-Sealcoating Recommended

**Signs it's time:** - Asphalt turning gray (oxidation visible) - Small cracks appearing (alligator cracking) - Rough texture (loss of binder) - Water pooling (surface deterioration)

**Action**: Schedule another combined sealcoating + striping project to restart the cycle

**ROI**: Every $1 spent on sealcoating saves $4-$6 in repaving costs over 10 years

Choosing the Right Contractor in North Jersey

Red Flags (Avoid These)

❌ No written estimate or contract ❌ "Today only" pressure tactics ❌ Asks for full payment upfront ❌ Can't provide insurance certificate ❌ No references or portfolio ❌ Uses generic "sealcoating mix" without specifics ❌ Promises to start "right now" (proper contractors are booked weeks ahead) ❌ No discussion of cure time or weather requirements

Green Flags (Look For These)

✅ Licensed and insured (asks for certificate of insurance) ✅ Written estimate with material specifications ✅ References from similar projects ✅ Clear timeline including cure times ✅ Discusses weather contingencies ✅ Explains prep work included ✅ Offers warranty in writing ✅ Asks about ADA compliance needs ✅ Provides maintenance recommendations

Questions to Ask Every Bidder

  1. **"What brand of sealer do you use and at what mix ratio?"**
  2. - Good answer: "We use [brand name] coal tar emulsion mixed at manufacturer specs (typically 75% sealer, 25% water with sand additive)"
  3. - Bad answer: "Our own blend" or vague answer
  1. **"How many coats will you apply?"**
  2. - Good answer: "Two coats applied perpendicular to each other"
  3. - Bad answer: "One thick coat is fine"
  1. **"What prep work is included?"**
  2. - Good answer: "Power sweeping, crack filling up to 1/4", cleaning oil stains, edge trimming"
  3. - Bad answer: "Just sweeping" or "Whatever's needed"
  1. **"What is your cure time before striping?"**
  2. - Good answer: "24-48 hours depending on temperature and humidity, we'll monitor conditions"
  3. - Bad answer: "We can stripe the same day" (MAJOR RED FLAG)
  1. **"Do you verify ADA compliance?"**
  2. - Good answer: "Yes, we measure all handicap spaces and access aisles to ensure 8' + 5' minimum widths per ADA requirements"
  3. - Bad answer: "We just repaint what was there before"
  1. **"What is your warranty?"**
  2. - Good answer: "2 years on sealcoating for workmanship, 1 year on striping"
  3. - Bad answer: "No warranty" or vague promises

Why Randy Seal Coating & Striping for Combined Services

Since 1994, we've specialized in exactly this: **coordinated sealcoating and striping projects** throughout Union and Essex County. Here's what 31+ years of experience means for you:

✅ **Package Pricing**: Save 10-15% vs. separate contractors ✅ **One Project Manager**: Single point of contact from quote to completion ✅ **Coordinated Scheduling**: Minimal disruption, faster completion ✅ **ADA Compliance Experts**: We verify every measurement ✅ **Premium Materials**: Coal tar emulsion, chlorinated rubber paint ✅ **Licensed & Insured**: $1M general liability, $1M vehicle coverage ✅ **Free Estimates**: No obligation, detailed written quotes ✅ **Weather Guarantees**: We won't start if forecast is poor ✅ **2-Year Warranty**: Sealcoating workmanship guaranteed

Service Areas

We serve 40+ municipalities across: - **Essex County**: Newark, Orange, West Orange, Montclair, Bloomfield, Livingston, Millburn, Maplewood, and all 22 towns - **Union County**: Elizabeth, Westfield, Cranford, Summit, Linden, Rahway, Union, Springfield, and more - **Passaic County**: Paterson, Clifton, Wayne, and surrounding areas

Ready to Save 15% on Your Next Project?

Don't make the expensive mistake of hiring separate contractors for sealcoating and striping.

**Get Your Free Combined Package Quote:** - 📞 Call: (862) 224-6666 - 🌐 Online: [Request Free Estimate](/) - ⏱️ Response Time: Within 24 hours

**What Happens Next:** 1. We schedule a site visit at your convenience 2. You get a detailed written estimate within 24 hours 3. We provide 2-3 optimal date options based on weather forecast 4. Your project is completed in 3-4 days with minimal disruption 5. You save 10-15% compared to separate services

**Current Wait Time**: Booking 3-4 weeks out for prime fall dates

---

*Randy Seal Coating & Striping has been the trusted name in asphalt maintenance throughout North Jersey since 1994. Family-owned, locally operated, and committed to exceptional results.*

Ready to Protect Your Asphalt?

Get a free quote for professional asphalt maintenance and protection services. Our team is ready to help extend the life of your driveway or parking lot.

Categories:

Maintenance TipsCost AnalysisCommercial Services

Share this article: