BRIDGE CLOSURE: January 30, 2025 - Full Year Closure

Passaic Street Bridge Closing:
Why Your Driveway Needs Protection NOW

Bridge Details:

  • Passaic River crossing (Ne-60)
  • 12-month complete closure
  • No vehicle or pedestrian access

Impact Zone:

  • • Summit (Chatham Township)
  • • New Providence Borough
  • • Thousands of daily commuters
  • • All neighboring streets

WARNING: Residential streets will becomedetour highwayscausing unprecedented driveway damage

Your Driveway Is About to Take a Beating

Here's what Summit and New Providence residents aren't considering:

Spillover Parking

  • • Commuters using your street
  • • Delivery truck turnarounds
  • • Construction vehicle parking

Street Vibrations

  • • 300% more traffic volume
  • • Foundation loosening
  • • Accelerated cracking

Chemical Damage

  • • Increased emissions
  • • Winter salt tracking
  • • Oil and fluid leaks

Physical Wear

  • • Wider turning radius
  • • Emergency shortcuts
  • • Neighbor overflow

Streets Most at Risk

Summit (Chatham Township)

Impact Level: High

  • River Road approaches
  • Passaic Avenue intersections
  • Southern Boulevard connections
  • Woodland Avenue residents

New Providence

Impact Level: High

  • Springfield Avenue corridors
  • South Street neighborhoods
  • Academy Street vicinity
  • Central Avenue properties

Properties within 1 mile of the bridge will see the most dramatic traffic increases

12-Month Damage Timeline Without Protection

1

February-March 2025

Initial stress cracks from increased traffic

2

April-June 2025

Crack expansion, surface deterioration begins

3

July-September 2025

Heat + traffic = accelerated damage

4

October-January 2026

Major repairs needed without protection

Unsealed driveways facing 12 months of detour traffic show 3x more damage and need resurfacing 2 years earlier

Why Seal Coating BEFORE January 30 Is Critical

Professional seal coating creates a protective barrier that:

Vibration Resistance

Flexible sealant absorbs traffic vibrations

Prevents $2,000+ in crack repairs

Chemical Protection

Shields against vehicle emissions and salt

Avoids $3,000+ in surface damage

Wear Prevention

Strengthens surface against turning vehicles

Extends life by 3-5 years

The Cost of Waiting

ServiceBefore ClosureAfter Damage
Preventive Seal Coating$800-1,200N/A - Too Late
Crack Repair$0 (prevented)$2,000-3,000
Full Resurfacing$0 (avoided)$5,000-8,000
Total Investment/Cost$800-1,200$7,000-11,000

* Average residential driveway costs. Commercial properties see proportionally higher savings.

Summit Area Special: Beat the Bridge Closure

Pre-Closure Protection Package:

  • FREE traffic impact assessment
  • 15% discount for properties within 1 mile
  • Priority scheduling before January 30
  • Multi-driveway neighborhood discounts
  • Evening and weekend availability

Limited Time Bonus:

Schedule by August 31

Get an additional 5% off and guaranteed completion before bridge closure

  • • Free crack sealing included
  • • 3-year warranty upgrade
  • • Complimentary driveway edging

Don't Let Detour Traffic Destroy Your Investment

With less than 6 months until the Passaic Street Bridge closes, now's the time to protect your driveway. One professional seal coating application will defend against a full year of detour damage.

Closure Date: January 30, 2025

Act now - Schedule before the rush