The September Advantage
After 15 years in the industry, we've discovered September consistently delivers the best results for pavement repairs. Here's why:
Perfect Temperature Range
60-75°F days, 45-55°F nights
Ideal for asphalt curing without extreme heat or cold stress
Low Precipitation
Average 3.5" rainfall
September has 40% less rain than spring months in NJ
Moderate UV Exposure
Balanced sunlight
Enough sun for curing without excessive heat damage
Contractor Availability
Post-summer rush
Better scheduling and faster project completion
September Price Advantage
| Service | Spring | Summer | September | Your Savings |
|---|---|---|---|---|
| Crack Sealing | $500-800 | $600-900 | $450-700 | Save 15-20% |
| Pothole Repair | $200-400 | $250-450 | $175-350 | Save 20-25% |
| Sealcoating | $500-800 | $550-850 | $450-750 | Save 10-15% |
| Driveway Paving | $3500-5000 | $4000-5500 | $3200-4500 | Save 15-20% |
Average September Savings: 15-20% off peak season pricing
Seasonal Comparison
| Factor | Spring | Summer | September | Winter |
|---|---|---|---|---|
| Temperature | Variable | Too hot | Perfect | Too cold |
| Rain Risk | High | Moderate | Low | Snow/Ice |
| Cure Time | 48-72hr | 24hr | 24-48hr | N/A |
| Material Cost | High | Highest | Lower | N/A |
| Wait Time | 2-3 weeks | 3-4 weeks | 1-2 weeks | N/A |
Technical Benefits of September Repairs
Superior Material Bonding
The 60-75°F temperature range allows asphalt to achieve optimal viscosity, creating stronger bonds that last 30-40% longer than summer applications.
- Better aggregate adhesion
- Reduced thermal cracking
- Optimal compaction density
Perfect Curing Window
September's stable weather provides the ideal 30-day cure period before winter, ensuring maximum durability and protection.
- Consistent day/night temperatures
- Low humidity levels
- Minimal weather disruptions
September Success Stories
"We've been scheduling our parking lot maintenance for September for the past 5 years. The cost savings and quality difference compared to spring work is remarkable. Our lots hold up better through winter too."
- Property Manager, Livingston Shopping Center
"Randy's team explained why September was ideal for our driveway resurfacing. They were right - faster curing, better finish, and we saved $800 compared to the spring quote we got."
- Homeowner, Millburn NJ